BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 25, 2025

Site work and paving for a mixed-use development in Anchorage, Alaska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Anchorage Water and Wastewater Utility (AWWU) Surface Restoration Contract Surface Restoration Work is generally needed to restore a disturbed area after AWWU has conducted excavation operations to repair a water or sewer appurtenance on its underground infrastructure. This restorative work will include all operations, materials, and working arrangements essential for Restoration of a disturbed area and referred herein as a Designated Work Site, to its pre-existing condition, as close as is possible. Work shall conform to the referenced resources under 100.04 Specifications, Codes, Ordinances, and Standards and changes noted under 100.05 Changes to Municipality of Anchorage Standard Specifications (M.A.S.S.) in these Special Provisions, and the Engineer may direct the Contractor to diverge from these specifications when necessary, and it is in the best interest of the MOA. The Work may include but is not limited to restoring asphalt pavement for roadways, asphalt driveways private and public, pavement markings, concrete driveways-private and public, curb, gutter, and sidewalks; removal of unsuitable fill material and replacement with suitable fill material; topsoil, seeding, flowers, bushes, trees, fencing, retaining walls, and other landscape oddities. It may also include the use of Temporary Patch material when asphalt is not available and could require that these patches be maintained until asphalt is available. The payment for Work shall be on a unit price basis, as listed in the Bid Schedule, unless otherwise described in these Special Provisions and, or agreed to in advance by the Engineer. All Work must be done to the satisfaction of the Engineer, and there is a warranty period of one (1) year once the completed Work is inspected and then accepted by the Engineer as complete. Question Deadline 07/17/2025 at 12:00 PM AKT All questions shall be submitted prior to the question due date. This will be the final opportunity to ask questions or request clarifications. The Surface Restoration Contract has a Not-To-Exceed limit of $1,500,000 per Contract year for all combined Work done under this Contract and may have to be rebid if funding for the Contract exceeds its NTE amount. ESTIMATED CONSTRUCTION COST: Between: $1,000,001 - $3,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
4
Bidding Soon
154
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

September 22, 2025

Project location map

Multiple Locations, Anchorage, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.