BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 19, 2025

Site work for a water / sewer project in Edmonton, Alberta. Completed plans call for site work for a water / sewer project.

The 151 Street Sanitary South Trunk runs beneath the arterial road of 151 Street, from 93 Avenue to 99 Avenue. It is a 1,676 mm by 1,200 mm arch-shaped sanitary trunk, that's approximately 1.03km long, at 27m to 30m deep. The 99 Avenue trunk downstream is a project recently completed, and is not included in this scope of work. This project consists of the rehabilitation of the existing 151 Street Sanitary South Trunk that's within the underground drainage system. The objective of the project is to further the trunk's life span and also reduce the potential risk of a collapse and possible ground subsidence. Documents can be obtained from https://epcor.bidsandtenders.ca/

Post-Bid

Water / Sewer

$1,000,000.00

Public - State/Provincial

Site Work

22

9

17

3

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
34
Bidding Soon
577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2025

October 17, 2025

Project location map

151 St NW, Edmonton, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.