BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Site work and paving for a sidewalk / parking lot in Keo, Arkansas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

furnishing all labor, equipment, materials, supplies, and supervision necessary for the construction of proposed walking trail improvements as described in the plans and specifications. A CERTIFIED OR CASHIER'S CHECK, or an acceptable bid bond in an amount not less than five percent (5%) of the total bid shall accompany each bid as a guaranty that, if awarded the contract the bidder will promptly enter into contract with the City of Keo, Arkansas and furnish bonds on the forms provided. THE SUCCESSFUL BIDDER OR BIDDERS will be required to furnish a Performance and Payment Bond, each in the amount of the contract, written by a responsible surety company authorized to do business in the State of Arkansas that is satisfactory to the Owner. BIDDERS ARE expected to inspect the site of the work and to Inform themselves of all local conditions. The time of completion shall be 90 calendar days including Saturdays, Sundays and legal holidays.

Bid Results

Sidewalks / Parking Lot

$72,475.00

Public - City

Paving, Site Work

1

1

10

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
31
Bidding Soon
429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 8, 2025

Project location map

226 Main Street, Keo, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.