BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Site work for a water / sewer project in Purcell, Oklahoma. Completed plans call for site work for a water / sewer project.

Rural Water #8 water line, Located at State Highway 59 and Interstate 35, approximately1.75 miles West fromthe town of Wayne on the SE & NE quadrants of the intersecting highways, in McClain County. All BIDS must be made on the required BID form. All blank spaces for BID prices must be filled in, in ink or typewritten, and the BID form must be fully completed and executed when submitted. Only one Copy of the BID form is required. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Bids received more than ninety-six (96) hours before time specified and Bids received after the time set for opening Bids will not be considered and will be returned unopened. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Each bid must be accompanied by a bid bond payable to the OWNER for 5% (five percent) of the total amount of the bid. A certified check may be used in lieu of the bid bond. No bid security is required if the bid is $7,500.00 or less. As soon as the bid prices have been compared, the OWNER will return the bonds of all except the three lowest responsible bidders. The bid bond of the successful bidder will be retained until the Performance Bond, Statutory Bond, Maintenance Bond and Certificate of Insurance have been executed and approved, after which it will be returned. The bid security of the two remaining unsuccessful Bidders will be returned after the successful Bidder has entered into a contract and has furnished the required bonds and insurance. A Performance Bond, Statutory Bond and Maintenance Bond each in the amount of 100% (100 percent) of the Contract Price with a corporate surety approved by the OWNER will be required for the faithful performance of the Contract. Attorneys-in-fact who sign Bid Bonds and Performance Bonds must file with each Bond a certified and effective dated Copy of their Power-of-Attorney. The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond, Statutory Bond, Maintenance Bond and Certificate of Insurance within fourteen (14) calendar days from the date when Notice of Award is delivered to the Bidder. The Notice of Award shall be accompanied by the necessary Agreement and Bond forms. In the failure of the Bidder to execute the Agreement, the OWNER may consider the Bidder in default in which case the Bid Bond accompanying the proposal shall become the property of the OWNER. The OWNER within fourteen (14) calendar days of receipt of acceptable Agreement, Bonds and Certificate of Insurance signed by the party to whom the Agreement was awarded shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the OWNER not execute the Agreement within such period, the BIDDER may by WRITTEN NOTICE withdraw the signed Agreement. Such NOTICE of withdrawal shall be effective upon receipt of the NOTICE by the OWNER. The time for completion is sixty (60) days. Liquidated damages will be $750 per calendar day Bidresult 1.Alternative A WEE Construction Co-$231,828.00 2.Alternative B WEE Construction Co-$202,858.00

Award

Water / Sewer

$434,686.00

Public - County

Site Work

14

15

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
63
Bidding Soon
713
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

September 10, 2025

Project location map

I-35, Purcell, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.