Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 9, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of an educational facility in Kennesaw, Georgia. Working plans call for the renovation of a 78,190-square-foot educational facility.
“The owner has determined a prequalified list of construction managers. A Request for Proposals for CMaR has not yet been established.” Kennesaw State University recently acquired the 78,190 SF facility at 500 Chastain Center as part of a strategic initiative to support institutional growth and improve operational efficiency. In May 2024 the BOR approved Wellstar Champions Complex naming for the facility, and location of the proposed renovation. The renovation aligns with KSUs 2024 Strategic Plan and Campus Master Plan goals, including the repurposing of Chastain Pointe for the College of the Arts, prioritizing academic and research growth within the campus core, optimizing administrative space, and supporting the KSU Athletic Association. By modernizing infrastructure and consolidating programs, the project reduces reliance on leased facilities, enables the planned demolition of outdated structuressuch as 3213 Campus Loop Road, located in a floodplain and promotes more efficient use of university owned space. The renovation project will modernize building systems infrastructure and bring the facility up to the current code. This would involve adding a sprinkler system, an updated fire alarm system, and fiber network connectivity to meet university standards. Additionally, some controls modifications will be implemented to maintain the operation of existing systems as a separate enabling project, all new or modified building systems identified in the renovation scope will incorporate updated controls to ensure long-term performance and integration. Strategic interior improvements will include reconfigured office layouts, updated finishes, flexible conference rooms, touchdown workstations, and a break room. Minimal targeted exterior upgrades will address façade painting, site access, and signage. These improvements will serve various KSUs Football Operations, as well as various departments within Administration & Finance Division including Planning, Design & Construction, Plant Operations, Environmental Health & Safety, and Event & Venue Management departments. The project aims to allow the Football Operations to use the office spaces and multipurpose meeting rooms for team activities. The building would also include dedicated areas for video review, taping, locker rooms, and a satellite sports medicine services.
Final Planning
Educational
$11,750,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
June 7, 2027
500 Chastain Center Blvd, Kennesaw, GA
Related To This Project
Kennesaw, GA
Bid Date: Aug 05 2025
Kennesaw, GA
Bid Date: Aug 05 2025
Kennesaw, GA
Bid Date: Aug 04 2025
Kennesaw, GA
Bid Date: Aug 19 2025
Kennesaw, GA
Bid Date: Sep 03 2025
Kennesaw, GA
Bid Date: Aug 20 2025
Kennesaw, GA
--
Kennesaw, GA
Bid Date: Oct 01 2025
Kennesaw, GA
Bid Date: Jul 24 2025
Kennesaw, GA
--
Kennesaw, GA
--
Kennesaw, GA
--
Kennesaw, GA
Bid Date: Jul 14 2025
Kennesaw, GA
Bid Date: Jul 23 2025
Kennesaw, GA
Bid Date: Jul 14 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed