Site work and paving for a sidewalk / parking lot in Great Falls, Montana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

UPN 10190000 The Off System Sidewalks - Great Falls project is intended to improve sidewalk connectivity through construction of new sidewalk facilities where existing pedestrian routes have only intermittent sidewalks. This project is located primarily in the northwest quadrant of the City. Major improvements will include the construction of new sidewalk and ADA-compliant curb ramps. The Great Falls District ADA Upgrades project is intended to improve accessibility and mobility within the City of Great Falls. Existing facilities do not meet current ADA standards, and upgrades to the existing infrastructure are warranted, and have been previously identified as a part of MDT's ADA transition plan. Possible treatments to remove accessibility barriers include replacement of non-compliant ADA curb ramps, installing pedestrian actuated pushbuttons, pedestrian countdown signals, eliminating tripping hazards, deteriorated sections, and non-compliant cross slopes. Question Deadline 07/19/2025 Questions must be posted at least 48 hours before the SOQ is due to MDT. MDT will provide an Answer posted on the same "Question and Answer Forum". MDT will make every effort to post the answer within 48 hours after the question is posted. The Question-and-Answer Forum will close seven calendar days prior to the proposal due date. A proposal guaranty in an amount not less than ten percent (10%) of the total Bid Price Proposal amount will accompany each Firm's Bid Price Proposal. The guaranty must be in the form of a surety bond, payable to MDT. The successful Firm will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Montana Estimated Tied Project Cost - $9.0 to $11.0 Million MTDOT - RFQ Contractor - GF District ADA Upgrades *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Sidewalks / Parking Lot

$11,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
9
Bidding Soon
66
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2025

November 19, 2025

Project location map

US-87, Great Falls, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.