Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 23, 2025 at 8:00 PM
Updated July 24, 2025
Site work and paving for a sidewalk / parking lot in Great Falls, Montana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
UPN 10190000 The Off System Sidewalks - Great Falls project is intended to improve sidewalk connectivity through construction of new sidewalk facilities where existing pedestrian routes have only intermittent sidewalks. This project is located primarily in the northwest quadrant of the City. Major improvements will include the construction of new sidewalk and ADA-compliant curb ramps. The Great Falls District ADA Upgrades project is intended to improve accessibility and mobility within the City of Great Falls. Existing facilities do not meet current ADA standards, and upgrades to the existing infrastructure are warranted, and have been previously identified as a part of MDT's ADA transition plan. Possible treatments to remove accessibility barriers include replacement of non-compliant ADA curb ramps, installing pedestrian actuated pushbuttons, pedestrian countdown signals, eliminating tripping hazards, deteriorated sections, and non-compliant cross slopes. Question Deadline 07/19/2025 Questions must be posted at least 48 hours before the SOQ is due to MDT. MDT will provide an Answer posted on the same "Question and Answer Forum". MDT will make every effort to post the answer within 48 hours after the question is posted. The Question-and-Answer Forum will close seven calendar days prior to the proposal due date. A proposal guaranty in an amount not less than ten percent (10%) of the total Bid Price Proposal amount will accompany each Firm's Bid Price Proposal. The guaranty must be in the form of a surety bond, payable to MDT. The successful Firm will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Montana Estimated Tied Project Cost - $9.0 to $11.0 Million MTDOT - RFQ Contractor - GF District ADA Upgrades *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Sidewalks / Parking Lot
$11,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2025
November 19, 2025
US-87, Great Falls, MT
Related To This Project
Great Falls, MT
Bid Date: Aug 20 2025
Great Falls, MT
Bid Date: Aug 08 2025
Great Falls, MT
Bid Date: Aug 20 2025
Great Falls, MT
Bid Date: Sep 26 2025
Great Falls, MT
Bid Date: Aug 22 2025
Great Falls, MT
Bid Date: Aug 05 2025
Great Falls, MT
Bid Date: Aug 06 2025
Great Falls, MT
Bid Date: Aug 25 2025
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
Bid Date: Jul 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
