Published July 16, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a water / sewer project in St Andrews, Manitoba. Completed plans call for site work for a water / sewer project.

Reference Number 0000298124 Question Acceptance Deadline 2025/07/23 01:00:00 AM EDT Questions are submitted online - No Direct questions to the office of AtkinsRealis Inc., 148 Nature Park Way, Winnipeg, MB R3P 0X7, Phone: 204-786-8080, Fax: 204-786-7934. .1 Questions may be received by email sent to: Nathan.Lee2@atkinsrealis.com Pricing Lump sum Work of the Contract comprises the Project, for the Septic Field System Upgrade, Mapleton School, Lord Selkirk School Division. Project Work includes provision of all required labour & materials for a fully operational heating system. Work includes but is not limited to the following: .1 To design the Septic Field System Upgrade for the school including the following work: .1 Collapse and fill the existing six (6) septic tanks. .2 Existing line to the septic field to be collapsed and abandoned. .3 Provide one (1) new 4500 gal septic tank. .4 Extension of existing septic lines to the new septic tanks. .5 Installation of new driveway at west end of school and west of existing asphalt. Driveway must support weight of a pump truck at full capacity (15,000 lbs). .6 Landscaping of the areas above the existing septic tanks and lines. .7 Excavation as required to facilitation installation of new septic tanks. .8 Relocation of buried electrical line from school to field house to accommodate installation of new septic tanks. .9 Reinstallation of septic tank high water alarm switch to building alarm system 2 Provide the required bonds and liability insurance to ensure such specified assurances to the Owner. .3 Coordination with equipment supplier(s) to schedule delivery, unloading and safe storage of equipment. .4 Layout of the work for construction of complete system and associated works as noted in drawings and specifications. .5 Protect existing foundations, superstructure, interior finishes, plant and equipment during construction. .6 Clean-up of project and site upon completion. .7 Repair all defects identified during the first year after completion of Work. 2 Division of the Work among subcontractors, suppliers or vendors is solely the Contractor's responsibility. Neither the Owner nor Consultant assumes any responsibility to act as an arbiter to establish subcontract terms between sectors or disciplines of work. Installation of new septic tank and demolition of existing tanks. Official bid documents must be obtained from www.merx.com

Post-Bid

Water / Sewer

$300,000.00

Public - State/Provincial

Site Work

4

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
30
Bidding Soon
498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 25, 2025

Project location map

112 Calder Rd, St Andrews, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.