BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Site work and renovation of a water / sewer project in Saint Louis, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A general description of the work to be done under these contract documents is as follows: Replacement of existing pipes, valves, pumps, surge tank, HVAC, transformer, controls, motor control center, generator replacement, and Automatic Transfer Switch; repairs to the existing crane rail, installation of monorail and fall protection trolley, and installation of detention piping. Question Deadline 08/14/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing by email, Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$4,369,611.00

Public - City

Renovation, Site Work

47

46

18

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
1
Bidding Soon
899
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

October 20, 2025

Project location map

7491 Christopher Dr, Saint Louis, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.