BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 13, 2025 at 8:00 PM

Updated November 5, 2025

Site work for a bridge / tunnel in Waynesville, North Carolina. Completed plans call for site work for a bridge / tunnel.

The Town of Waynesville, North Carolina, is seeking proposals from qualified firms to replace the existing culverts located beneath Sanctuary Drive. Currently, two 18-inch corrugated metal pipes (CMPs) are in place; however, these have failed as a result of severe storm events associated with Hurricane Helene in the fall of last year. Companies shall direct any questions and inquiries to Eli Woody at ewoody1@waynesvillenc.gov or by phone at 828-456-3706 or Hutch Reece, Deputy Director Public Works (Operations), by email at hreece@waynesvillenc.gov or by phone at 828-456-3706.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
123
Bidding Soon
1,347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2025

January 5, 2026

Project location map

Sanctuary Dr, Waynesville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.