BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work for a civil project in Chittenden, Vermont. Completed plans call for site work for a bridge / tunnel.

The Town of Chittenden is accepting proposals for a culvert replacement of a 3.5-ft 3-sided open bottom culvert with a 119"x80" aluminum structural plate culvert. The primary scope includes dewatering, pipe installation, headwalls, traffic control. and a turbidity/flow control plan. Question Deadline 07/31/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing with copiesto the Owner

Award

Bridges / Tunnels

$149,000.00

Public - City

Site Work

9

7

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
98
Bidding Soon
1,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 8, 2025

Project location map

Holden Rd, Chittenden, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.