BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Renovation of a municipal facility in Galveston, Texas. Completed plans call for the renovation of a municipal facility.

The City of Galveston encourages all Disadvantaged Business Enterprise (DBE) vendors to participate in all invitations to proposals; including all HUB, women and minority owned businesses. Please follow the submittal instructions in the proposals package for electronic submittals and upload the entire response package at online. Question Deadline 08/07/2025 online submisison. SCOPE A. The Contractor shall include in his proposal the allowances stated in this and following Sections of the Project Manual. Allowance may pertain to purchase and delivery only, or to purchase, delivery, and installation, or to services only, or to contingency fund. B. If the allowance is stated for purchase and delivery only, all of the Contractor's handling costs on site, overhead, profit, and other expenses contemplated for the allowance material and equipmentshall be included in the base proposal. C. If the allowance is stated for purchase, delivery, and installation, all of the Contractors handling costs on site, overhead, profit, and other expenses contemplated for the allowance material and equipment shall be included in the allowance. D. If the allowance is stated for services only, all of the Contractor's handling costs on site, overhead, profit, and other expenses contemplated for the services shall be included in the allowance. E. If the allowance is stated for contingency, all of the Contractors handling costs on site, overhead, profit, and other expenses contemplated for the allowance material and equipment shall be included in the allowance. F. The Contractor shall purchase the allowance materials and equipment as directed by the Engineer/Architect in writing. The Engineer/Architect will have obtained the necessary forms and signaturesto accomplish this. If the actual cost of the required work is more or less than all the allowance estimates the Contract Sum will be adjusted accordingly by Change Order. G. The Engineer/Architect cannot certify applications for payment of any allowance item unless a fully executed Allowance Expenditure Authorization (AEA) is on file with the Owner, Engineer/Architect, and Contractor.

Post-Bid

Municipal

$600,000.00

Public - City

Renovation

47

30

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
192
Bidding Soon
3,067
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 9, 2025

Project location map

823 Rosenberg St, Galveston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.