BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work, paving and outdoor lighting for a mixed-use development in Sacramento, California. Working plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

As of September 12, 2025, this project has been cancelled. The City will pursue alternative methods to secure a contractor. The City collaborated with the Shingle Springs Band of MiWok Indians and Wilton Rancheria to design a children's play area with a "riparian corridor" theme. The project would include a fence around the entire play area with decorative concrete pavement and poured in place rubber surfacing. The playground equipment includes a large play structure, three tule huts, a tule boat and a grinding stone interactive piece. A custom archway will also be installed at the entrance. The Contractor will be responsible to receive, store and install the City purchased playground equipment. The site will also have benches and signage. In addition, the project will include a trash enclosure structure to be used by the restaurant adjacent to the site. This structure will not be accessible to the public. The site also includes lighting fixtures. Question Deadline 07/23/2025 at 2:00 PM PT Online Q&A - Yes Inspections to the playground equipment previously purchased by the City of Sacramento will be inspected by the City staff. Other inspections/permits should be included in the bid. This project is subject to the requirements of the Community Workforce Training Agreement (CWTA). This project is subject to 5% Local Business Enterprise (LBE) requirements. License Requirements - A, C-10, C-27 Bid Valid - 90 days from bid closing date Liquidated Damages - $1,000/Day Start/Delivery Date - September 2025 Project Duration - 120 working days Pre-Bid Meeting - No

Final Planning

Playgrounds / Parks / Athletic Fields

$1,466,000.00

Public - City

Outdoor Lighting, Paving, Site Work

33

9

4

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
13
Bidding Soon
1,572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

October 6, 2025

Project location map

1400 Front St, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.