Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 24, 2025
Demolition, site work and renovation of a mixed-use development in Colfax, Louisiana. Conceptual plans call for the renovation of a fire / police facility; for the demolition of a 2,400-square-foot, one-story above grade pre-engineered storage facility; for site work for a pre-engineered storage facility; pre-engineered storage facility; and fire / police facility.
The Grant Parish Police Jury is seeking the services of a qualified Engineering firm or Engineer, Architectural firm or Architect (Designer) to provide Engineering/Architectural and related technical services pertaining to grant funding through the Federal Emergency Management Agency (FEMA) Hazard Mitigation Assistance (HMA), FEMA's Public Assistance Program (PA), and possibly the U.S. Department of Housing and Urban Development, Louisiana Office of Community Development (OCD). Procurement efforts will be in accordance with Federal Code of Regulations (2CFR200) and the Parish's Federal Procurement Programs. The Parish is requesting Qualification Statements for professional services needed to design and implement infrastructure improvements funded through the grant. The implementation of this project will be conducted in a manner that complies with all applicable federal regulations for the Federal Emergency Management Agency (FEMA) Hazard Mitigation Assistance (HMA) program under the Robert T. Stafford Disaster Relief and Emergency Assistance Act and Housing and Urban Development (HUD) Community Development Block Grant (CDBG) under Title I of the Housing and Community Development Act of 1974. The Parish has received approval of an application from FEMA for Wind Retrofit of 911 Communication Center project. The scope of work includes site topographic surveys, site assessment, preparation of bidding and contract documents, construction administration services, construction observation, and project closeout for the Wind Retrofit of 911 Communication Center Project . Grant Parish Police Jury proposes a phased project to retrofit the existing 911 Communication Center by increasing the design wind speed of the 911 PSAP building to 150 mph. This wind speed was selected based on review of the FEMA P-361 Safe Rooms for Tornadoes and Hurricanes, Fourth Edition, April 2021, that identifies the design wind speed for Risk Category IV buildings and hurricane safe rooms. The FEMA P-361 document indicates the design wind speed at the project site is 120 mph for Risk Category IV buildings and 160 mph for hurricane safe rooms. The existing structure is a 2,400 square foot one-story wood framed masonry building with an asphalt shingle roof constructed in 1983. The list of mitigation activities below was evaluated by a professional engineer and determined the following modifications will increase the design wind speed to 150 mph. Roof: Remove 3-tab asphalt shingle roof, vinyl soffits and entry porch ceiling. Add additional framing at soffits and porch ceiling. Install new metal roof designed to resist wind load pressures and uplift resistance. Install metal soffits panels and metal porch ceiling, trim and gutters. Siding: Remove existing vinyl siding at gable ends of building and replace with concrete hardi-plank siding. Add additional framing to meet wind load requirements. To meet the 150-mph wind requirement, the hardi-plank installed will be 6 inches wide and 5/16 inch thick. Window and Entry storefront: Remove residential single hung windows (12 total), existing main entry storefront and replace with laminated plastic glazing storefront debris resistant units. Install and paint new casework at interior of windows and storefront. Windows will meet high velocity hurricane zone requirements that have been tested for impact from small and large missiles and pressure differentials. Carport: Remove existing aluminum carport and install approximately 8-10 inches of additional concrete paving at carport. Remove existing concrete precast steps and replace with concrete. Install new metal carport (approximately 24' x 24'). Front and Rear Entry Doors: Remove existing metal doors and replace both doors with a 150-mph wind rated Heavy Commercial Steel Door. The new door will meet hurricane resistant test standards and include heavy duty anchoring, steel reinforcing and hardware components that firmly secure the door to hurricane door within the frame. The Designer will consult with the Parish to review project descriptions, federal requirements and compliance measures, and scheduling. The Designer will provide estimated costs. The Designer will furnish plans and specifications for the Wind Retrofit of 911 Communication Center Project . The Parish will have final review of the plans to ensure that grant compliance is achieved. The Designer will assist the Parish in procuring a contractor to construct the project. The Designer is to assist in conducting a pre-construction conference and on-going correspondence and coordination with the contractor during construction. The Designer will review and make recommendations concerning all contractor submittals and pay requests. The Designer will submit all documentation and pay requests to the Parish or the designated project agent for final review and approval. The Designer will develop and submit regular reports that demonstrate progress on the project. Reports could be requested as frequently as monthly but will be required no less than quarterly. The Designer will assist the Parish and designees in the preparation and submission of all required documents. This will include, but is not limited to, site assessment, survey, design plans, procurement, inspections, equipment testing reports, and photographs. The Designer will conduct final inspections at the site and assist the Parish and designees with grant closeout, as needed. The details of the scope of services and the associated fee will be negotiated with the selected offeror. It is anticipated that all fees will be negotiated on a lump sum fixed price basis. Questions should be addressed to Sissy Pace, Secretary/Treasurer at (318) 627-3157. The Grant Parish Police Jury is an Equal Opportunity employer. Small and/or minority owned firms, disadvantaged and women - owned business enterprises are encouraged to participate. The method of Contractor Selection has not been Determined at this time.
Conceptual
Fire / Police
$5,000,000.00
Public - County
Demolition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2026
To Be Determined, Colfax, LA
Related To This Project
Colfax, LA
Bid Date: Feb 04 2021
Colfax, LA
Bid Date: Sep 10 2025
Colfax, LA
Bid Date: Aug 13 2025
Colfax, LA
Bid Date: Aug 13 2025
Colfax, LA
Bid Date: Jan 30 2025
Colfax, LA
Bid Date: Feb 06 2025
Colfax, LA
--
Colfax, LA
Bid Date: Sep 25 2024
Colfax, LA
Bid Date: Aug 29 2024
Colfax, LA
Bid Date: Mar 14 2024
Colfax, LA
Bid Date: Mar 12 2024
Colfax, LA
Bid Date: Apr 14 2022
Colfax, LA
Bid Date: Jul 13 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
