BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated August 14, 2025

Demolition, site work and new construction of a pre-engineered storage facility in Lewiston, Minnesota. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The project involves the construction of a 12,379 SF one-story, slab-on-grade Pre-engineered steel building to house fire apparatus and ambulance garage, gear locker room, department offices, kitchen, training room, single car garage, toilet rooms and ambulance crew quarters. Work will include demolition of an existing masonry and precast concrete fire and ambulance building and minor soil corrections. Questions regarding design and technical specifications may be addressed to CRW Architecture + Design Group. Contact Mr. Jose Rivas at 507-206-2601 Bidders shall be submitting a Base Bid for the Work described in the Bidding Documents. A single prime contract will be awarded for work based on Bid Amount and Qualifications. The bid shall be accompanied by bid security in the form of a surety bid bond, cashier's check or certified check, drawn on a state or national bank domiciled within the State of Minnesota in an amount not less than ten percent (10%) of the maximum base bid submitted, payable without condition to the Owner as a guarantee that the bidder will promptly enter into a contract with the Owner for the work described and that they will furnish a bond to the Owner covering payment and performance of the contract. The successful bidder will be required to furnish and pay for a "Performance Bond" and "Labor and Materials Payment Bond" each in the full amount of the contract by a surety (or sureties) approved by the Owner. The cost of the bonds shall be included in the lump sum pricing. Bids will be reviewed and Work shall commence upon receipt of a Notice to Proceed. Estimated date of Notice to Proceed is August 13, 2025 to allow for material procurement. The contractor will have full access to the project site no later than August 18, 2025 to begin construction. Tentative City Council Approval: August 13, 2025 Tentative Construction Start: August 18, 2025 Substantial Completion: June 1, 2026 Final Completion: June 12, 2026. The issuance of this Advertisement for bids is not a license to incur reimbursable expenses by the bidder(s) to seek, prepare or submit their bid. No fees or expenses associated with providing bids will be paid to any contractor submitting a bid by the Owner, Architect or Engineer. Questions regarding design and technical specifications may be addressed to CRW Architecture + Design Group. Contact Mr. Jose Rivas at 507-206-2601 The Owner reserves the right to reject any and all bids, accept any bid it deems to be in its best interest, to waive informalities or irregularities in bids submitted, and waive minor irregularities or discrepancies in quote procedure. Bids may not be withdrawn within ninety (90) days after the scheduled closing time for receiving bids. The City of Lewiston, MN reserves the right to reject any or all bids and to waive any irregularities within the bids

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$2,998,200.00

Public - City

Demolition, New Construction, Site Work

66

34

21

3

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
114
Bidding Soon
1,198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

August 18, 2025

Project location map

85 N Fremont St, Lewiston, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.