Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 29, 2025 at 8:00 PM
Updated July 30, 2025
Demolition, site work, paving and new construction of a civil project in Lewiston, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.
Summary of work MnDOT is planning a resurfacing and bridge replacement project on I-90 between Nodine and Dakota in Winona County. Construction is scheduled for 2026. The following is the planned work on I-90 from Nodine to Dakota in Winona County. I-90 Nodine Hills map I-90 project map Repave 5 miles of westbound and 4.7 miles of eastbound I-90. Replace the westbound I-90 bridge over Winona Co. Rd. 101. Replace approach panels and bridge barrier guardrail connections on the westbound I-90 bridge over southbound Hwy 61. Improve safety by providing a slight banking of the right lane of northbound I-90 approaching the bridge over southbound Hwy 61. Install new guardrail on the eastbound and westbound lanes and improve drainage. Install a reinforcement and a synthetic liner to reduce sinkhole risks associated with Karst geology. Clean and reestablish rock catchment areas. Traffic impacts Single lane traffic during paving and bridge work. Delays are expected when traffic must travel in single lanes. The project is included in the State's 2025-2029 Capital Improvement Program (CIP). As of July 29, 2025, construction expected Spring 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$17,300,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
I-90, Lewiston, MN
Related To This Project
Lewiston, MN
Bid Date: Aug 26 2025
Lewiston, MN
Bid Date: Dec 16 2025
Lewiston, MN
Bid Date: Jul 31 2025
Lewiston, MN
Bid Date: Jul 31 2025
Lewiston, MN
Bid Date: Jun 16 2025
Lewiston, MN
Bid Date: Mar 31 2025
Lewiston, MN
Bid Date: Mar 11 2025
Lewiston, MN
Bid Date: Oct 08 2024
Lewiston, MN
--
Lewiston, MN
Bid Date: May 03 2024
Lewiston, MN
Bid Date: Jul 15 2021
Lewiston, MN
Bid Date: Oct 06 2023
Lewiston, MN
Bid Date: Jan 28 2022
Lewiston, MN
Bid Date: Mar 18 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
