Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Site work and paving for a mixed-use development in Clearlake, California. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
**As of November 12, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Project has been Rebid The City of Clearlake, ("City") invites for the furnishing of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for Arrowhead/Burns Valley & Olympic Drive Rehabilitation Project, Project No. LF2025(1) (the "Project"). Question Deadline 09/22/2025 at 5:00 PM PT Discrepancies in, and/or omissions from the Plans, Specifications or other Contract Documents or questions as to their meaning shall be immediately brought to the attention of the City by submission of a written request for an interpretation or correction to the City. Questions regarding the plans and specifications shall be addressed to Marisa Hewitt, Project Engineer, California Engineering Company (530) 751-0952 or emailed to mhewitt@cecusa.net. The last day for questions 17-DRINFRA17001-00057 Bidresult 1.Arrowhead/Burns Valley road rehab argonaut constructors-1661511.70 2.Olympic Drive Rehabilitation argonaut constructors-1759358.50 The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified The successful bidder shall comply with the substitution request provisions set forth in the Special Conditions, including any deadlines for substitution requests which may occur at least 10 working days prior to the bid opening date : The work in general consists of asphalt concrete rehabilitation: roadway grinding, fabric and fiber-reinforced asphalt concrete paving, asphalt concrete dike installation, thermoplastic striping, and such other items of work as are required to complete the project. The estimate of the quantities of work to be done is approximate only, being as a basis for the comparison of bids, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount or any portion of the work as directed by the City Engineer. Incidental items of construction necessary to complete the whole work in a satisfactory and acceptable manner as shown on the plans and as provided for in the specifications and not specifically referred to in this section, shall be understood to be furnished by the Contractor. The work in general consists of asphalt concrete rehabilitation: roadway grinding, fabric and fiber-reinforced asphalt concrete paving, asphalt concrete dike, new 12" HDPE storm drain, rock lining a drainage swale, and thermoplastic striping and pavement markings. Engineer's Estimate: $5,100,000.00
Bid Results
Roads / Highways
$3,420,870.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2025
November 28, 2025
Multiple Locations, Clearlake, CA
Related To This Project
Clearlake, CA
Bid Date: Sep 02 2025
Clearlake, CA
Bid Date: Nov 03 2025
Clearlake, CA
Bid Date: Nov 03 2025
Clearlake, CA
Bid Date: Feb 12 2026
Clearlake, CA
Bid Date: Jun 16 2025
Clearlake, CA
--
Clearlake, CA
Bid Date: Apr 11 2025
Clearlake, CA
--
Clearlake, CA
--
Clearlake, CA
Bid Date: Jan 16 2025
Clearlake, CA
Bid Date: Sep 25 2024
Clearlake, CA
Bid Date: Jun 24 2024
Clearlake, CA
Bid Date: Jul 11 2024
Clearlake, CA
Bid Date: May 28 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
