Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Site work for a civil project in Seattle, Washington. Completed plans call for site work for a water / sewer project.

Scope includes construction of a 7-million gallon below grade combined sewer overflow (CSO) storage tank, a diversion structure, demolition and replacement of the Chelan regulator station, and installation of approximately 2,600 lineal feet of open-cut and trenchless (micro-tunneling and pipe ramming) influent 60-inch pipe. Submersible drain pumps will discharge wet weather flows from the storage tank to the effluent conveyance system. The effluent pipeline will discharge to the West Duwamish Interceptor for treatment at the West Point Treatment Plant. Construction of the influent conveyance is expected to include removing abandoned concrete and timber foundations. The Project area has been used for a variety of industrial purposes and multiple sites in the vicinity have some level of documented soil or groundwater contamination. Target Schedule: RFP release anticipated Q1, 2026. Preconstruction services are contemplated to occur starting in 2026, and construction services are contemplated to start in Q3 2029. Construction is anticipated to complete Q4 2034. Question Deadline 08/01/2025 Submit all inquiries in writing via email to the Contract Specialist and the Backup Contract Specialist at least four business days before the Submittal Due Date Primary Contract Specialist: Jenny Sebero, jsebero@kingcounty.gov, 206-263-5738 Backup Contract Specialist: Corinne Easter, corinne.easter@kingcounty.gov, 206-477-8556 2. Construction sequencing of the storage tank assumes a top-down construction method, utilizing interior and exterior slurry walls and multiple phases of excavation. Additionally, dewatering is anticipated for open cut, shaft, and trenchless excavations and over-excavation of a portion of the storage tank, along with permanent ground anchors to mitigate buoyant uplift forces on the structure. The adjacent facility foundation preparation includes ground improvements to mitigate seismic ground deformation. Chelan Storage Tank Top-Down Construction 1. Install Interior and Exterior Slurry Walls 2. Install Dewatering Wells 3. Excavate to Permit Installation of Shoring for Top Slab Construction 4. Construct Top Slab 5. Excavate Inside Tank 6. Construct Permanent Ground Anchors 7. Construct Bottom Slab 8. Construct Liner Walls 9. Pour Back Construction Access Openings in Top Slab (if required)

Post-Bid

Water / Sewer

$410,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
107
Bidding Soon
1,767
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

July 1, 2029

Project location map

Multiple Locations, Seattle, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.