BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project Location - : This Project is located in southeast Seattle in Lakeridge Park starting at the Taylor Creek trail entrance at 68th Ave S & Holyoke Way S (north end of project site) and continuing south approximately 2,000 feet along the trail. PROJECT DESCRIPTION This Project consists of the following elements of Work: Stabilize approximately 210 feet of sloped areas along the Taylor Creek trail by constructing micropiles and a concrete grade beam, make temporary and permanent improvements to the boardwalk and small bridges along the trail needed for construction equipment access, soil restoration in disturbed areas (vegetation restoration to be done by others), construct a temporary sewer bypass, and construct a 10-foot extension of two existing stormwater cu Iverts. Question Submission Deadline:August 7, 2025, 5:00pm QUESTIONS: Written questions must be submitted via email to Ryan.Brady@seattle.gov no later than 5:00 p.m. on the Thursday before the Bid. Opening Date A Notice to Proceed for this project will be issued on April 1, 2026. Contract Executed to OMA CONSTRUCTION INC for 1,753,338.88(Base Bid+ Tax)

Award

Roads / Highways

$1,753,339.00

Public - City

Paving, Site Work

26

26

9

13

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
85
Bidding Soon
1,736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

April 1, 2026

Project location map

Multiple Locations, Seattle, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.