Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 14, 2025 at 8:00 PM
Updated August 15, 2025
Site work for a civil project in Seattle, Washington. Completed plans call for site work for a water / sewer project.
Scope includes construction of a 7-million gallon below grade combined sewer overflow (CSO) storage tank, a diversion structure, demolition and replacement of the Chelan regulator station, and installation of approximately 2,600 lineal feet of open-cut and trenchless (micro-tunneling and pipe ramming) influent 60-inch pipe. Submersible drain pumps will discharge wet weather flows from the storage tank to the effluent conveyance system. The effluent pipeline will discharge to the West Duwamish Interceptor for treatment at the West Point Treatment Plant. Construction of the influent conveyance is expected to include removing abandoned concrete and timber foundations. The Project area has been used for a variety of industrial purposes and multiple sites in the vicinity have some level of documented soil or groundwater contamination. Target Schedule: RFP release anticipated Q1, 2026. Preconstruction services are contemplated to occur starting in 2026, and construction services are contemplated to start in Q3 2029. Construction is anticipated to complete Q4 2034. Question Deadline 08/01/2025 Submit all inquiries in writing via email to the Contract Specialist and the Backup Contract Specialist at least four business days before the Submittal Due Date Primary Contract Specialist: Jenny Sebero, jsebero@kingcounty.gov, 206-263-5738 Backup Contract Specialist: Corinne Easter, corinne.easter@kingcounty.gov, 206-477-8556 2. Construction sequencing of the storage tank assumes a top-down construction method, utilizing interior and exterior slurry walls and multiple phases of excavation. Additionally, dewatering is anticipated for open cut, shaft, and trenchless excavations and over-excavation of a portion of the storage tank, along with permanent ground anchors to mitigate buoyant uplift forces on the structure. The adjacent facility foundation preparation includes ground improvements to mitigate seismic ground deformation. Chelan Storage Tank Top-Down Construction 1. Install Interior and Exterior Slurry Walls 2. Install Dewatering Wells 3. Excavate to Permit Installation of Shoring for Top Slab Construction 4. Construct Top Slab 5. Excavate Inside Tank 6. Construct Permanent Ground Anchors 7. Construct Bottom Slab 8. Construct Liner Walls 9. Pour Back Construction Access Openings in Top Slab (if required)
Post-Bid
Water / Sewer
$410,000,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
July 1, 2029
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Aug 13 2025
Seattle, WA
Bid Date: Sep 02 2025
Seattle, WA
Bid Date: Aug 20 2025
Seattle, WA
Bid Date: Aug 12 2025
Seattle, WA
Bid Date: Aug 11 2025
Seattle, WA
Bid Date: Aug 13 2025
Seattle, WA
Bid Date: Aug 27 2025
Seattle, WA
Bid Date: Sep 03 2025
Seattle, WA
Bid Date: Aug 06 2025
Seattle, WA
Bid Date: Jul 16 2025
Seattle, WA
Bid Date: Nov 28 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed