BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Site work for a water / sewer project in Appleton City, Missouri. Conceptual plans call for site work for a water / sewer project.

Qualifications for preliminary engineering services and subsequent engineering design services to assist in a proposed project. The project consists of the completion of the City ofAppleton City's Drinking Water State Revolving Fund (DWSRF) project. The proposed project is to improve existing water distribution piping and meters. The City of Appleton City reserves the right to accept and/or reject any and all bids. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
28
Bidding Soon
1,037
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

Project location map

Multiple Locations, Appleton City, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.