BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and paving for a transportation facility in Albuquerque, New Mexico. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The project will extend from the east most right-of-way of the Sunport Blvd/I-25 Interchange east to Yale Blvd and will include the circulatory lanes around the parking structure, including the upper deck (departures) and lower deck asphalt pavement and will include lower deck crosswalk improvements. Repaving limits terminate on Yale, just past the merge point with the parking structure loop road and at the University Blvd through lanes for the entrance and exit ramps from Sunport Blvd to University Blvd. Proposed improvements will include mill and inlay operations to repair or replace existing asphalt pavement to meet minimum pavement design recommendations and restriping of the roadway. Following the public bid reading, bids will be considered by the City and an award of the Contract, if made, will be within thirty (30) consecutive calendar days after the Bid Opening. Contract if awarded, will be awarded in accordance with the Gender Pay Equity Ordinance (5-5-31 COA). For questions about registration or submitting Proposals through electronic bidding, Customer Support at 952-233-1632

Award

Transportation Terminals

$2,812,254.00

Public - City

Paving, Site Work

61

11

26

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
22
Bidding Soon
319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

2200 Sunport Blvd, Albuquerque, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.