BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 11, 2025 at 8:00 PM

Updated October 12, 2025

Renovation of a military facility in Kennedy Space Center, Florida. Completed plans call for the renovation of a military facility.

NASA/John F. Kennedy Space Center is issuing a Request for Proposal (RFP) for 80KSC025R009, Revitalize Power Systems at the VAB Tower C, John F. Kennedy Space Center, Florida. Project Control Number (PCN): 99300, 99300.1 The North American Industry Classification System (NAICS) code for this procurement is 237130, Power and communication Line and Related Structures Construction with a size standard of $45,000,000. The objective of this project is to replace the obsolete substations and associated equipment which will significantly increase the safety of the facility and maintenance personnel. Additionally, the new substations will increase the availability and reliability of the VAB Tower C power system. This project consists of replacing existing VAB Tower C substations 804, 874 (10th floor) and 875 (32nd floor) and all associated 480V sub-fed panels located inside Tower C at the VAB with new reliable code compliant electrical substations and associated downstream equipment. Additionally, a new Arc Flash study will be performed as a part of this project. This is a 100% Small Business Set-Aside procurement. The project period of performance is 800 calendar days. Estimated award amount is anticipated between $5,000,000 and $10,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work includes, but is not limited to, the following: 1. Removal existing electrical equipment and installation of new substations (switchgear/transformers/medium voltage switches), including installation of programmable logic controllers (PLC) at locations inside the new substation, installation of PLC control and power wiring, installation of sensing devices, and connection to PLCs for the circuit. 2. Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled are known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities. This project involves working in a fully operational facility that cannot have any significant duration of downtime without substantial coordination around launch, launch vehicle processing schedules, and testing and manufacturing related to various launch vehicles. Phasing of work around daily operations of the VAB are critical to the success of the project. Daily coordination with operations personnel for outages and work in different areas will be required to keep the VAB operational while performing the work specified in the contract documents. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.

GC Bidding

Military

$10,000,000.00

Public - Federal

Renovation

78

19

90

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
2
Bidding Soon
947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2025

January 9, 2026

Project location map

To Be Determined, Kennedy Space Center, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.