BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Site work for a mixed-use development in Coker, Alabama. Completed plans call for site work for a municipal facility; and water / sewer project.

Project Description: Adjusting existing drives to accommodate the Installation of a new scale. A section of existing retaining wall will be removed and rebuilt for the installation of a new parking area. Prospective bidders will be notified of the results of pre-qualification and bid packages will be made available to approved bidders no later than 5:00 p.m. Friday, September 12, 2025. Pre-qualification submissions that are submitted by fax will not be accepted. The principal items ofwork include the following: A New Truck Scale A New Lift Arm gate Replacement of exit gates & fencing 1640 ~ S.Y. Concrete Pavement 234 ~ L.F. Retaining Wall 205 ~ L.F. 30" Storm Piping 116 ~ L.F. 18" Storm Piping Pre-qualification Applications Ifyou are interested in submitting a sealed bid for the captioned project, you are required to submit a fully completed Contractor's Affidavit of Qualifications (with all required attachments included) to Mr. W. Bradford Roane, Jr. at the following address no later than: 5:00 p.m. Friday, August 15, 2025. All pre-qualification submissions will be treated as confidential. The Awarding Authority reserves the right to reject any pre-qualification submission which is not responsive or where the acceptance of such submission would not be in the best interest of the Awarding Authority. The responsiveness of the submission will be determined by the completeness and accuracy of the submission. An incomplete submission will delay and possibly eliminate consideration of that applicant's submission. The pre-qualification of contractors does not imply that any bid submitted by a pre-qualified contractor automatically qualifies that bid as a "competitive," "responsible," or "satisfactory" bid. Prequalification Applications may be obtained at the Black Warrior Solid Waste Facility Office, 3301 Landfill Drive, Coker,Alabama and at the office ofThree Notch group, Inc., 11 West Court Square, Andalusia, Alabama. Prospective bidders will be notified ofthe results ofpre-qualification and bid packages will be made available to approved bidders no later than 5:00 p.m. Friday, August 29, 2025. Pre-qualification submissions that are submitted by fax will not be accepted. The County requires the Project to be completed in one hundred eighty (180) calendar days from date ofNotice to Proceed. Bidders will be required to provide Bid security in the form of a Bid Bond or cashier's check in the amount of a sum no less than five (5) percent ofthe Bid Price but not more than $10,000.00. All bids must be submitted in a sealed envelope bearing on the outside the name of the bidder, bidder's license number, address and name of the project. Your Bid will be required to be submitted under a condition of irrevocability for a period of sixty (60) days after submission. The attention of bidders is called to the provisions of State Law Governing General Contractors, as set forth in Title 34, Chapter 8, Article 1, Code of Alabama of 1975, as amended; and the provisions of said law shall govern bidders insofar as it is applicable. The above-mentioned provisions of the Code make it illegal for the Owner to consider a bid from anyone who is not properly licensed under such code provisions. In addition, bidders must carry the Specialty Construction-Environmental classification as listed in the latest edition ofthe Roster of the State Licensing Board for General Contractors, Montgomery, Alabama. The Owner, therefore will not consider any bid unless the bidder produces evidence that he is so licensed. Neither will the Owner enter into a Contract with a foreign corporation which is not qualified under State Law to do business in the State of Alabama. The attention of nonresident bidders is called to the provisions of Alabama Law, Title 39, Chapter 3, Code of Alabama 1975, as amended, relating to preference to be given to resident contractors in Alabama over nonresident contractors in the award of contracts in the same manner and to the same extent as provided by the laws ofthe state of domicile of the nonresident contactor, and to the requirements that the bid documents tendered by any nonresident contractor must be accompanied by "a written opinion of an attorney-at-law licensed to practice law in such nonresident contractor's state of domicile as to the preference, in any or none, granted by the law ofthat state to its own business entities who's principal places of business are in that state in the letting of any or all public contracts" Each Bidder, and each Subcontractor, is required to complete and submit Document 00450 -Affidavit of Immigration Compliance along with their E-Verify Program Memorandum of Understanding at the time ofthe Bid. No Contract will be awarded to any Bidder who does not submit the required Immigration Compliance documents. Contractor will be required to provide two (2) Owner's Protective Liability Policies. Named Insured shall be as follows: Black Warrior Solid Waste Disposal Authority Three Notch Group, Inc. The Authority reserves the right to accept or reject any or all Bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. between $700k-900k

Post-Bid

Municipal

$900,000.00

Public - City

Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

15

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
56
Bidding Soon
576
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

October 24, 2025

Project location map

3301 Landfill Dr, Coker, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.