Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 18, 2025 at 8:00 PM
Updated August 19, 2025
Renovation of an educational facility in Honolulu, Hawaii. Completed plans call for the renovation of a educational facility.
Question End Date - Tuesday, July 29, 2025 Answer End Date - Friday, August 1, 2025 Unless otherwise indicated, questions regarding this solicitation must be directed, via email or phone, to the Contact Person listed. Contact Email: joan.rabago-coelho@k12.hi.us Phone Nbr: 808-590-6502 Fax Nbr: 808-831-6750 , jeannine.villanueva@k12.hi.us, Buyer: RYAN ICHIMURA, Email: ryan.ichimura@k12.hi.us Provide all labor, materials, equipment, controls and all incidental material and work necessary for the installation and proper operation, including connections to electrical power supply and interconnecting ductwork including controls (analog and direct digital), for all new A/C equipment. 6. Liquidated Damages: In accordance with the Interim General Conditions, Article 7 Prosecution and Progress, Section 7.26 Failure to Complete the Work On Time, upon failure to complete the work or any portion of the work within the time or times fixed in the contract or extension thereof, the Contractor shall pay liquidated damages to the State, in the amount of $100, per calendar day of delay for contracts less than $50,000, or in the amount of $200, per calendar day of delay for contracts $50,000 or higher, unless otherwise noted. Remove existing R-22 air-cooled packaged AC equipment in the mechanical room at the library building Bldg. S and two (2) dehumidifier units in the library building Bldg. S and appurtenances. A new packaged AC equipment and exhaust fan will be provided in the Mechanical Room. The Packaged AC equipment will be provided with a 3rd party refrigerant detection system that will energize an exhaust fan when a refrigerant leak is detected. The removed equipment shall become the property of the Contractor and shall be disposed of offsite at an approved disposal site in accordance with all EPA laws and regulations. Disconnect and replace all wires that connect to fan motors. Do not disturb other components. (2) Provide all labor, materials, equipment, controls and all incidental material and work necessary for the installation and proper operation, including connections to electrical power supply and interconnecting ductwork including controls (analog and direct digital), for all new A/C equipment. Replacement of the equipment shall be as in accordance with equipment schedule shown in "Attachment A"
Bid Results
Educational
$140,360.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2025
September 8, 2025
324 Kapahulu Ave, Honolulu, HI
Related To This Project
Honolulu, HI
Bid Date: Sep 19 2025
Honolulu, HI
Bid Date: Aug 26 2025
Honolulu, HI
Bid Date: Aug 01 2025
Honolulu, HI
Bid Date: Oct 17 2025
Honolulu, HI
Bid Date: Aug 27 2025
Honolulu, HI
Bid Date: Sep 22 2025
Honolulu, HI
Bid Date: Aug 04 2025
Honolulu, HI
Bid Date: Jul 29 2025
Honolulu, HI
Bid Date: Aug 04 2025
Honolulu, HI
--
Honolulu, HI
Bid Date: Jul 31 2025
Honolulu, HI
Bid Date: Sep 30 2025
Honolulu, HI
Bid Date: Jul 30 2025
Honolulu, HI
Bid Date: Jul 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
