BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2026 at 8:00 PM

Updated March 25, 2026

Site work for a water / sewer project in Tallahassee, Florida. Completed plans call for site work for a water / sewer project.

Project Description: The work associated with the construction of the Pump Station 182 Redundant Power Project includes the carrying out of all duties and obligations and the furnishing of all labor, material, tools, equipment, and other incidentals necessary or convenient to the successful completion of the project. This project generally consists of the construction of a redundant underground power supply from the Utility's (City of Tallahassee Electric Department) distribution system to Pump Station 182. Portions of the work will be performed by COT Electric, and portions of the work shall be performed by the Contractor. The Scope of Supply/Division of Responsibility is defined by a document attached to the Electrical Specifications (Appendix D). Pump Station 182 Scope of Work The Contractor's scope of work at Pump Station 182 includes supply and installation of two 4-inch electrical conduits via horizontal directional drilling from an existing termination cabinet on Engineering Way to an existing termination cabinet at the Pump Station 182 site. Additional termination cabinets (supplied by COT Electric) are to be installed by the Contractor along the conduit route. The Contractor's scope also includes coordination with the Electric Utility (City of Tallahassee Electric Department) for the installation of a pad mounted transformer and installation of the primary conductors. The transformer pad and the primary conduits on the Pump Station 182 site shall have been installed by Others. THE DEADLINE FOR QUESTIONS HAS CHANGED 03/09/2026 TO 03/11/2026@ 5:00 PM. The Contractor's scope of work shall also include the supply and installation of the Main Breaker (2000 amps) and the Automatic Transfer switch (ATS - Redundant Power or Main-to-Main) as coordinated with the overall PS #182 Project. The installation shall include conduit and cable from the secondary of one transformer to the new Main Breaker and from the new Main Breaker to the new ATS (one side of the Main-to-Main ATS aka Service -to- Service ATS). The work shall also include rework of the existing Main Breaker's outgoing feeder to the new Main-to-Main ATS and the installation of the conduit and cable for the "Load" connection of the new ATS to the Normal Power connection of the existing ATS (Utility-to- Generator ATS the generator connection will have been made by Others).

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

18

6

38

5

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 23, 2026

Project location map

Multiple Locations, Tallahassee, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.