BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Renovation of a mixed-use development in Fullerton, California. Conceptual plans call for the renovation of a educational facility; and 78,710-square-foot theater / auditorium.

This proposed project is the second phase of the Visual Arts Complex Modernization project. It will renovate/replace a total of 78,710 GSF in four existing buildings in Visual Arts Complex (#008A, #008B, #008C, and #008D) which were constructed in 1969. The project will correct functional, building code, and programmatic deficiencies and extend the service life of a 50-year-old building complex. All aspects of the buildings will be improved as needed to support program needs and student success for another 50 years. As of July 21, 2025 ,This project is included in the State's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$103,387,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
622
Active Projects
255
Bidding Soon
3,579
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2029

Project location map

800 State College Blvd, Fullerton, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.