Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2025 at 8:00 PM

Updated March 4, 2026

Site work for a civil project in Minneapolis, Minnesota. Completed plans call for site work for a water / sewer project.

The rehabilitation of a section of interceptor 1-CL-455 located in Crystal, outside MCES lift station L30. The Project will include replacement of about 100 feet of sagged pipe and rehabilitation of two manhole structures. Direct inquiries to the Metropolitan Council’sContract Administrator, SallyAmoe, 651-602-1238, sally.amoe@metc.state.mn.us. Question Deadline 08/08/2025 The MCUB participation goal for this contract is 8%

Award

Water / Sewer

$1,628,533.00

Public - State/Provincial

Site Work

69

12

10

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
103
Bidding Soon
1,754
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

4943 53rd Ave N, Minneapolis, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed