Published September 25, 2025 at 8:00 PM

Updated October 2, 2025

Demolition, site work, renovation and addition to a mixed-use development in Ardsley, New York. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; office development; office development; office development; and office development.

The intent of this Bid request is to obtain an offer to perform work to complete Security/Office Addition,4 Classroom Addition, Interior Renovations & Related Work located at the Ardsley High School for a Stipulated Sum, in accordance with the Contract Documents. Bids will be received for four (4)separate Prime Contracts as follows HVAC. Work of this proposed Contract comprises building construction, including Related General construction including site work and asbestos removal/remediation, HVAC. Perform the Work within the time stated in Section 01 1010 Milestone Schedule. All work for this project shall not commence prior to the issuance of Letter of Award by the Owner. The items of work shall be scheduled and completed as stated in Section 01 1010 Milestone Schedule. Failure to complete either date listed in Section 01 1010 Milestone Schedule, shall subject the Contractor(s) to be assessed liquidated damages list in Article 8 of the General Conditions and any additional costs incurred by the Owner, including but not limited to, Construction Manager, Fuller and D'Angelo, P.C., Consultants, Owner's staff, overtime, and legal costs as required to complete the scheduled item. The attention of the bidders is specifically directed to the provisions of the General Conditions of the Contract Article 8 of the General Conditions that time is of the essence to the Contract and that on no account will the Contactor(s) be permitted to assert a claim for damages for delays. The bidder, in submitting an offer, accepts the Contract Time period stated for performing the Work. The completion date stated in the Agreement and Section 01 1010 Milestone Schedule. Questions: Any and all questions about the interpretation or clarification of the Bid Documents, or about any other matter affecting the Work or pertaining to the bid must be directed in writing on the form in Section 00 2115 - RFI Form to the: Architect Fuller and D'Angelo, P.C. 45 Knollwood Road . Elmsford, NY 10523 . Attention: Frank DiFato, RA . Voice: 914-592-4444 E-mail: frankd@fullerdangelo.com. Evidence of qualifications. Owner's Representaive, Architect, and Construction Manager reserves the right to reject a proposed subcontractor for reasonable cause Project Location: 500 Farm Road. Ardsley, New York 10502 Bids shall be accompanied by a security deposit as follows Bid Bond of a sum no less than 10 percent of the Bid Amount on AIA A310 Bid Bond Form, will be required for all Proposals. Refer to Section 00 6000 - Bonds and Certificates for additional requirements. The security deposit will be returned after delivery to the Ardsley Union Free School District of the required Performance and Payment Bond(s) by the accepted bidder. Document note : Please note REVplans (online) is the designated location and means for distributing and obtaining all bid package information. The Owner reserves the right to require additional information it deems appropriate concerning the history of the contractor's performance of each such contract. Project no. NFUD0002.00

Post-Bid

Educational

$1,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

261

57

124

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
966
Active Projects
499
Bidding Soon
7,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 24, 2025

Project location map

500 Farm Rd, Ardsley, NY