BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated November 18, 2025

Renovation of a municipal facility in Fontana, California. Completed plans call for the renovation of a municipal facility.

All improvements noted, for PHASE 1 only, as identified on the attached construction plans, and consisting of 38 pages prepared by Andresen Architecture Inc. (''Construction Plans''). Improvements include the construction/installation of first floor restrooms, interior stairs, fire sprinklers, second floor framing, elevator and framing up to existing ceiling sheathing. Contractor shall be responsible for all improvements specifically identified on or implied by Construction Plans for PHASE 1, unless specifically noted on the Construction Plans to be performed by others. Refer to attachments for information on the specifications required to be met. Online Q&A Yes Q&A Deadline 08/07/2025 2:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date 9/30/2025 Project Duration 70 Working Days Liquidated Damages the sum of $1,500.00 for each and every calendar day of delay beyond the time prescribed in the Contract Documents License Requirements Class "B" contractor's license or a Class "C" specialty license sufficient to perform the work. Project Type Bid Response Types Line Items Subcontractor Bid Bond General Attachment General Attachment General Attachment Type of Award Lump Sum (DE-26-06-SB)

Award

Municipal

$528,900.00

Public - City

Renovation

40

21

11

8

Subscribe For Documents

106 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
530
Active Projects
250
Bidding Soon
3,779
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2025

September 30, 2025

Project location map

8572 Sierra Ave., Fontana, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.