BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2025 at 8:00 PM

Updated October 19, 2025

Demolition, site work and addition to a detention facility in Charleston, South Carolina. Working plans call for the addition of a detention facility; for the demolition of a detention facility; and for site work for a detention facility.

Naval Facilities Engineering Systems Command (NAVFAC) Southeast is planning a Design-Bid-Build Military Construction (MILCON) project for the Nuclear Power Training Facility Simulation Expansion at Joint Base Charleston. The project includes construction of a two-story Training Support Building, a multi-story High Bay simulator building, and a Mechanical Building. It also involves improvements to utility infrastructure--electrical, water, sanitary, storm water, and telecom--to support the new facilities. Additional scope includes causeway widening, utility upgrades, road elevation adjustments, deep foundation construction, roadway and pedestrian improvements, construction of an electrical substation with associated feeds, and reconstruction and expansion of parking areas. Some project documents are designated as Controlled Unclassified Information (CUI), requiring compliance with DOD Instruction 5200.48. All construction must be performed by U.S. firms using U.S. citizens, and certain personnel will be subject to trustworthiness determinations. The estimated construction cost range is between $250,000,000 and $500,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Jails / Prisons

$500,000,000.00

Public - Federal

Addition, Demolition, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
1
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

Project location map

To Be Determined, Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.