Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work and paving for a mixed-use development in Yankton, South Dakota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

o Furnish and Install approximately 297 LF of 6" PVC Water Main o Furnish and Install approximately 366 LF of 6" Restrained Joint Water Main o Furnish and Install approximately 107 LF of 8" PVC Water Main o Furnish and Install approximately 70 LF of 8" Restrained Joint Water Main o Furnish and Install approximately 366 LF of 12" Steel Encasement Pipe (Jacked & Bored under BNSF Railroad) o Furnish and Install approximately 70 LF of 14" Steel Encasement Pipe (Jacked & Bored under BNSF Railroad) o Furnish and Install approximately 66 LF of 1" Water Service Pipe o Furnish and Install approximately 31.7 Tons of Asphalt Concrete Composite o Furnish and Install approximately 266 SY of 6" PCC Pavement o Furnish and Install approximately 221 SY of 6" PCC Approach Pavement o Furnish and Install approximately 213 LF of Curb and Gutter o All removals, restoration, and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. Upon request, in accordance with South Dakota Codified Law 5-18B-1, one paper copy of Bidding Documents shall be furnished, without charge, to each prime contractor resident in South Dakota who intends, in good faith, to submit a bid to the Owner. Additionally, if a paper copy is provided under the conditions of SDCL 5-18B-1, in consideration of the documents being provided at no charge, unsuccessful bidders agree to return the documents to the Issuing Office within thirty (30) days after the bid opening. All official notifications, addenda, and other Bidding Documents will be offered only through the designated websites. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein. Davis-Bacon and related acts provisions applied to this project. All provisions relative to those acts must be met. Davis Bacon wage rates must be used. The successful bidder, including any contractors and their subcontractors on the project, must be registered in SAM (System for Award Management). The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition of Certain Telecommunications and Video Surveillance Services or Equipment. NONDISCRIMINATION IN EMPLOYMENT The goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for disadvantaged/minority utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 1.2%. The goals are applicable to the Contractor's aggregate on-site construction workforce whether or not part of that workforce is performing work on a federal and federally assisted contract or subcontract. Payment for all work shall be in cash based on monthly estimates. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the issuing Office. Download delivery fee is $22.00, file size is 18 MB . A pre-bid conference will not be held. The goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for disadvantaged/minority utilization which shall be included in all federal and federally assisted construction contracts and subcontractsin excess of $10,000 shall be 1.2%

Post-Bid

Water / Sewer

$550,000.00

Public - City

Paving, Site Work

49

21

4

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
39
Bidding Soon
427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

September 3, 2025

Project location map

Multiple Locations, Yankton, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.