BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated August 26, 2025

Site work and paving for a civil project in Naples, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

This project is located in Collier County, 2 miles south of Oil Well Road, approximately 1 miles east of Desoto Blvd N, and stretches between 18th Ave N and Golden Gate Blvd to the south. It is being constructed by the BCSD to provide infrastructure for the Town of Big Cypress and the future Bellmar subdivision. It involves approximately 12,000 LF of 16 Water Main, 12 Irrigation Main, and 6 & 12 Force Main along with appx 4 miles of roadways of various cross-sections. Proposals will be evaluated in accordance with the criteria included in the Project Manual. The District reserves the right to reject any and all proposals, make modifications to the work, award the contract in whole or in part with or without cause, provide for the delivery of the project in phases, and waive minor or technical irregularities in any Proposal, as it deems appropriate, if it determines in its discretion that it is in the Districts best interests to do so. Any protest of the Project Manual, including the terms and specifications, must be filed with the District within 72 hours of pickup of the Project Manual, together with a protest bond in a form acceptable to the District and in the amount of $30,000.00. In the event the protest is successful, the protest bond shall be refunded to the protestor. In the event the protest is unsuccessful, the protest bond shall be applied towards the Districts costs, expenses and attorneys fees associated with hearing and defending the protest. Failure to timely file a protest will result in a waiver of proceedings under Chapter 190, Florida Statutes, and other law. Proposers are hereby notified that Section 287.05701, Florida Statutes, requires that the District may not request documentation of or consider a Proposers social, political, or ideological interests when determining if the Proposer is a responsible vendor. Proposals shall be in the form provided in the Project Manual and submitted to the email provided above. The District reserves the right to reject any proposals received after the time and date stipulated above. Each proposal shall remain binding for a minimum of one hundred and twenty (180) days after the proposal opening. All questions regarding the Project Manual or this project shall be directed in writing only to LJA Engineering at 7400 Trail Blvd #200, Naples, FL 34108, or emailed to Bids@lja,com. No phone inquiries please. Firms desiring to provide construction services for the referenced project must submit the required proposal documents by email no later than 11:00 a.m. on August 25th, 2025 to the district engineers email of Bids@lja.com.

Post-Bid

Roads / Highways

$1,800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
61
Bidding Soon
591
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 24, 2025

Project location map

Multiple Locations, Naples, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.