Site work for a road / highway in Key West Nas, Florida. Completed plans call for site work for a road / highway.

As of October 22, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Transmission Steel Pole Corrosion Protection Bid Bond 5% Question Deadline 08/08/2025 at 12:00 PM ET Vendors with questions pertaining to this bid specification must submit them in writing via email to purchasing@keysenergy.com BACKGROUND KEYS electrical system is currently supplied by a single, 138kV transmission line that interconnects with Florida Keys Electric Cooperative's transmission system at Knights Key, Florida. KEYS' existing transmission line system has been in service since the 1960s with some newer lines built in the late 1990s. These lines are critical to the supply of reliable electricity to KEYS customers. PROJECT SUMMARY This project encompasses mobilization/demobilization, measuring, surface cleaning, surface preparation, coating application, and final wrap of steel transmission poles over water and land. The Poles are both steel and galvanized steel construction and are located from Marathon, Florida, to Key West, Florida. Each steel pole on Transmission Lines 6, 7, 8, 9 and 11 will be cleaned and coated from 4' above the base plate down to include the baseplate, nuts/bolts, and under baseplate. Each steel pole on Transmission Lines 3 and 5 will be cleaned and coated from top to bottom In addition, this project requires the repair of damaged pole areas identified by a recent inspection. All structures are located in a subtropical environment with high humidity, high UV radiation, and salt spray and are located within one (1) mile or less from salt water. Because of the harsh salt environment, immediate repair is necessary to extend the life of the existing steel pole and prevent further corrosion. Contractor will be responsible for providing all necessary materials, labor, tools, and equipment to complete the scope of work. This project will start with Line 7 at Marathon, FL and continue towards Key West, FL on Line 6, Line 9, Line 3, Line 5, Line 8, and Line 11. SCOPE OF WORK Contractor is to provide services for corrosion maintenance of transmission line steel poles recommended by recent inspection (see attached "Steel Pole Recommendations" at "REFERENCE MATERIAL" Link). Contractor will be tasked for surface cleaning, surface preparation, and coating of the steel poles from 4' above the base plate to the baseplate on lines 6, 7, 8, 9, 11 and the full pole on lines 3 & 5, including baseplate, nuts and bolts. The Contractor shall also perform "Steel Pole Recommendations" from the Praxel Inspection on 4/15/2025. Contractor shall provide all necessary materials, labor, tools, and equipment for the project. Contractor is responsible for providing their own boat and means of accessing, launching, and storage of boat. The contractor shall be responsible for any damage which results from dripping and/or blowing of paint or other material during cleaning and/or surface preparation. 4' surface cleanse, application, and coating: Line 7: 90 steel poles, 37 on land and 53 on water, (location Big Pine Key to Marathon) Line 6: 25 steel poles on land, (location Big Pine Key to Big Coppitt Key) Line 9: 11 steel poles on land, (location Big Coppitt Key to US1 Stock Island) Line 8: 15 steel poles on land, (Kennedy Drive Substation Key West to US1 Stock Island) Line 11: 1 steel poles on land, (Kennedy Drive, Key West) Full pole cleanse, application, and coating: Line 3: 7 steel poles on land, (US1 Stock Island to Second Street Substation Stock Island) Line 5: 6 steel poles on land, (US1 Stock Island to Second Street Substation Stock Island) Praxel Pole Recommendations: 54 Structures: See Appendix A Table 1: List of Structures & Recommendations and attached Praxel Summary found at "REFERENCE MATERIAL" Link. Project completion: May 1st, 2026.

Bid Results

Roads / Highways

$999,846.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
59
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

October 13, 2025

Project location map

Multiple Locations, Key West Nas, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.