BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Demolition, site work and new construction of a bridge / tunnel in Farmington, Utah. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. Project Description: An existing bridge in Farmington waterfowl management area needs to improved and strengthened. Questions Due Date: Jul 14th 2025, 3:00 PM MDT

Award

Bridges / Tunnels

$239,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

16

4

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
78
Bidding Soon
1,025
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 29, 2025

Project location map

To Be Determined, Farmington, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.