BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a civil project in Aurora, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Update:https://www.aurora.il.us/files/sharedassets/mainsite/v/1/finance/documents/budget/city-of-aurora-cip-2026-2035.pdf Traffic signal modernization at 4 intersections plus resurfacing along Commons Drive from New York Street to Mecay Div utilizing Surface Transportation Program (STP) federal funds administered through the Kane-Kendall Council of Mayors. T Federal participation for the project will be 80% for construction and construction engineering costs. The Illinois Departmen Transportation will front-fund the cost of construction and invoice the city for its 20% share and beyond the federal maximu participation amount. The city will be required to front-fund construction engineering. The costs to be paid by the city are reflected below. Phase I engineering will begin in 2025 utilizing a consultant. Phase II engineering is anticipated in 2026. Construction is anticipated to begin in 2028.Project is included in City of Aurora Fiscal Year 2026-2035 Page no 304 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Traffic signal modernization at 4 intersections plus resurfacing along Commons Drive from New York Street to McCoy Drive utilizing Surface Transportation Program (STP) federal funds administered through the Kane-Kendall Council of Mayors. The federal participation for the project will be 80% for construction and construction engineering costs. The Illinois Department of Transportation will front-fund the cost of construction and invoice the city for its 20% share and beyond the federal maximum participation amount. The city will be required to front-fund construction engineering. The costs to be paid by the city are reflected below. Phase I engineering will begin in 2025 utilizing a consultant. Phase II engineering is anticipated in 2026. Construction is anticipated to begin in 2028 As of July 24, 2025, The project is include in the City's 2025-2034 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
214
Bidding Soon
2,825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.