Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Renovation of an educational facility in Aurora, Colorado. Completed plans call for the renovation of a educational facility.
Reference Number 0000393748 This project will modernize the Cooling Towers, Pumps and controls in the Fitzsimons Building Chilled Water Plant. Cooling Tower modifications include the addition of Variable Frequency Drives, pumping redundancy, isolation valves in the chilled water piping system and a new BAS Sequence of Operation. (See RFP for full Scope) Question Deadline 08/06/2025 at 2:00 PM MT Questions are submitted online Yes, Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule on online. POINT OF CONTACT/CLARIFICATION Name: Rick Ritter Agency: CU Anschutz Medical Campus Email Address: rick.ritter@cuanschutz.edu Phone: (303) 817-8305 Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required Anticipated Construction Start 10/1/2025 Anticipated Construction Finish 4/1/2026 The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information. The Work of Project is defined by the Contract Documents and, in summary, briefly consists of the following: 1. Mechanical Scope of Work: a. Replace existing and provide new emergency chilled water pumps to serve the emergency chilled water piping distribution to Fitzsimons, Research Complex 1 & 2, and Anschutz Health Science Building b. Retrofit the (E) Cooling Tower with increased fan motor and VFD controls. c. Piping modifications for potential alternates or future equipment replacements. d. Provide BAS automation of switchover valves for main CUP chilled water and secondary chilled water pumping. 1. Electrical Scope of Work: a. Electrical scope of work shall support the above listed mechanical equipment replacements. New electrical distribution will be provided as needed. 2. Architectural Scope of Work a. Architectural work will support the mechanical installations with replacements for access. 3. Temperature Controls: a. All new equipment is to be tied into the existing temperature control system
Bid Results
Educational
$1,410,657.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2025
October 1, 2025
13001 E 17th Pl, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Oct 01 2020
Aurora, CO
Bid Date: Nov 09 2020
Aurora, CO
Bid Date: Jul 15 2021
Aurora, CO
Bid Date: Aug 13 2021
Aurora, CO
Bid Date: Jul 31 2025
Aurora, CO
--
Aurora, CO
Bid Date: Sep 11 2025
Aurora, CO
Bid Date: Aug 30 2021
Aurora, CO
Bid Date: Aug 11 2025
Aurora, CO
Bid Date: Aug 05 2025
Aurora, CO
Bid Date: Aug 01 2025
Aurora, CO
Bid Date: Aug 01 2025
Aurora, CO
Bid Date: Jul 28 2025
Aurora, CO
Bid Date: Jul 14 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
