BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work for a water / sewer project in Green River, Utah. Completed plans call for site work for a water / sewer project.

The Work of Project is defined by the Contract Documents and consists of the following 1. The Work includes all of the work of Divisions 01 thru 33 for the UDOT Green River Panel Coating and Mechanical Revisions. 2. Project will be constructed in accordance with DFCM requirements. This project has two main phases. The first focuses on exterior panel work, primarily involving repairs to Concrete Tilt-Up Panels. This includes filling honeycomb areas, routing and filling cracks, recaulking joints, and applying an exterior concrete panel silicone-modified elastomeric coating. For the coating application, all external fixtures like lights and signage will need to be removed or covered as specified. The second phase covers interior and roof work in the wash bay, materials testing lab, and construction office. This will involve installing and verifying tube heaters, adding ventilation to the wash bay, and replacing the ventilation hood in the materials lab. The base bid encompasses all equipment, labor, and materials required to complete the work as outlined in the plans and specifications. Concrete tilt-up panel and interior modifications Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. Question Deadline 08/05/2025 at 3:00 PM MT Online Portal

Award

Water / Sewer

$402,450.00

Public - State/Provincial

Site Work

30

19

5

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
43
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

235 E Main St, Green River, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.