BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2025 at 8:00 PM

Updated August 7, 2025

Site work and new construction of a residential development in Hayden, Colorado. Completed plans call for the construction of a residential development; and for site work for a residential development.

Reference Number 0000393800 Bid Intent Not Available The Hayden Housing Authority (HHA) is seeking proposals from qualified General Contractors to manage construction of a modular duplex housing development, Poplar Commons, that will provide much-needed affordable housing in Hayden, Colorado. The selected contractor will be responsible for comprehensive site work, coordination with a modular housing manufacturer (to be determined), and all delivery, setting, and stitching of modular units. This procurement will follow a public and competitive bidding process. Respondents must have demonstrable experience in modular construction, AIA contract formats, and public lender draw processes. HHA strongly encourages proposals from contractors with a proven record in delivering modular projects on time and on budget, particularly those involving affordable housing developments. Question Deadline 07/30/2025 at 11:59 PM MT All questions regarding this RFP must be submitted in writing via email to: Tim@reinenconsulting.com Mary@twelveinc.co Responses to all questions will be compiled and issued as a formal addendum by August 1, 2025. Project Name: Hayden Modular Housing Project Location: Old Skate Park on Poplar Street - Town of Hayden, Routt County, Colorado Owner: Hayden Housing Authority Total Buildings: 4 duplexes (8 total units) Unit Mix: Four (4) 1-bedroom / 1-bath units (single-story duplexes) Four (4) 2-bedroom / 1.5-bath units (two-story duplexes) Target AMI: Up to 80% of Area Median Income (AMI) Construction Type: Modular (off-site manufactured) Site Conditions: Vacant parcel with access to public utilities and roadway Design Intent: Modular units delivered and installed on permanent foundations Durable materials, energy-efficient systems, and climate-appropriate finishes Attractive and functional design integrated into the local neighborhood fabric Infrastructure that supports walkability and long-term community use Target Construction Start: Q1 2026 Target Completion: Q3 2026 The Hayden Housing Authority reserves the right to reject any and all proposals, waive informalities, and award a contract in the best interest of the project and community. This solicitation does not commit HHA to award or reimburse any costs incurred in preparation of a proposal.

Post-Bid

Residential Subdivision

$300,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
12
Bidding Soon
129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

January 1, 2026

Project location map

350 S Poplar St, Hayden, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.