BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 9, 2025 at 8:00 PM

Updated October 10, 2025

Renovation of a theater / auditorium in Easley, South Carolina. Completed plans call for the renovation of a theater / auditorium.

The selected contractor shall provide all labor, materials, and equipment to perform the following: 1. Perform a full HVAC load calculation for the theater area to determine optimal cooling needs. 2. Provide engineering documents and HVAC system design as required. 3. Supply and install two (2) 7.5-ton HVAC units or an alternative system based on accurate load calculations. 4. Include double-wall spiral ductwork for efficient air distribution. 5. Complete all electrical work necessary for new HVAC installation. 6. Provide and install all refrigerant piping and drain lines. 7. Conduct start-up and performance testing of the new system to verify full functionality. 8. Provide any additional recommendations necessary to restore and optimize the theater's climate control capacity. 9. Provide a detailed cost estimate and timeline for project completion. West End Hall - Phase 1 HVAC Enhancement for Main Theater Question Deadline 08/27/2025 Submitters are required to submit questions via email to cshort@cityofeasley.com and mdipietro@cityofeasley.com

Post-Bid

Theaters / Auditoriums

$800,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
1
Bidding Soon
622
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

October 10, 2025

Project location map

201 S 5th St, Easley, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.