BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Renovation of an educational facility in Germantown, Tennessee. Design plans call for the renovation of a educational facility.

Houston High School — GMSD's lone high school, opened in 1989 at 9755 Wolf River Boulevard — is the subject of what city leaders are calling a once-in-a-generation investment. The Germantown Board of Education engaged Fleming Architects to develop conceptual plans addressing both academic and athletic needs, presenting two renovation scenarios to the board Shelbychamberalliance that would significantly transform the school's dated appearance and facilities. Project Scope Fleming's full recommendations carry a price tag of $133 million to $145 million, though the final scope will depend on community input and public meetings. Shelbychamberalliance GMSD has organized the master plan into four phasing "buckets" — fine arts, academic spaces, athletics, and operations — each shaped by its own subcommittee of teachers, students, parents, and community members. Athletic plans include renovated varsity gym spaces for basketball and wrestling, additional practice fields, a new track, upgraded locker rooms, expansions to the tennis complex, a new football stadium, and a new indoor practice facility. Academic improvements include new classroom wings and a 300-seat lecture hall, while fine arts plans call for a new performing arts center and fine arts wing. Gmsdk12 The district has also flagged smaller near-term improvements — LED lighting upgrades, ceiling tile replacements, bathroom renovations — to be handled through its regular capital budget while the phased master plan takes shape. No construction manager or contractor has been selected. Fleming Architects Shelbychamberalliance, based in the Memphis area, has been the architect of record driving the master planning and conceptual design work since at least 2022, and would be the natural candidate to carry through to full design services — but no formal design or construction contracts have been awarded. The project remains in a planning and funding-resolution phase. What to Watch The next concrete milestone is the resolution of the funding strategy. GMSD is currently refining the plan and breaking it into phases to align with funding capabilities Gmsdk12, meaning the scope that actually moves to design and construction will likely be smaller than the full master plan vision, at least initially. Once a phase and funding package are locked in, architect contract expansion and a CM/contractor procurement would follow. Until the city and school board close the funding gap — through debt restructuring, alternative revenue, or phased scope reduction — no construction timeline can be established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Educational

$133,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
0
Bidding Soon
390
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

9755 Wolf River Blvd, Germantown, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.