BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 24, 2025

Site work for a water / sewer project in Hymera, Indiana. Completed plans call for site work for a water / sewer project.

Hymera New 100,000 Gallon Elevated Water Storage Tank Per Addendum 3, tender has been cancelled. The project will be re-tendered tentatively in early September 2025 or early October 2025. Last day for questions will be Friday, October 17, 2025 at 5:00 PM. The new 100,000-gallon elevated water storage tank will be constructed on the same site as the existing elevated tank. The Contractor shall demolish the existing elevated tank, then the Contractor shall construct the new 100,000 tank in its place. 2. A geotechnical report is not included in the project documents. The Contractor is responsible for completing their own geotechnical investigation once awarded the contract. Assumptions for foundation design are included in Sections 33 16 16 and 33 16 17 of the Project Manual. The geotechnical investigation must be completed and final report submitted to the Engineer prior to commencement of demolition activities. The contract will consist of the following scope of work: Construction of a new 100,000-gallon elevated water storage tank with all associated site piping, electrical, grading, fencing, and site restoration, Construction of a new bulk water dispensing station, Demolition of the existing elevated water storage tank with all associated disposal, clean-up, and site restoration. The Bidders attention is also called to the ìMinority/Women Owned Business Participationî and ìIndiana Veteran Owned Small Business Programî requirements contained in the Project Specifications. The State of Indiana has set a goal of 10% participation for minority and women owned businesses and 3% Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Bidders shall submit all questions to the Engineer in writing via email to Dustin Whalen, P.E. (dwhalen@hwcengineering.com). B. Questions will be taken until 5:00 PM local time October 17, 2025. At this time no further questions will be answered or changes made to the documents. A final addendum, if required, will be issued on Monday, October 20, 2025

Post-Bid

Water / Sewer

$2,500,000.00

Public - City

Site Work

20

27

21

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
81
Bidding Soon
1,082
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

December 22, 2025

Project location map

To Be Determined, Hymera, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.