Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Site work and new construction of a municipal facility in Kanawha, West Virginia. Completed plans call for the construction of a 31,419-square-foot, three-story above grade municipal facility; for site work for a municipal facility; 19,279-square-foot, two-story above grade municipal facility; 20,096-square-foot, two-story above grade municipal facility; and 5,330-square-foot municipal facility.

As of March 5, 2026, construction has not started. They are awaiting a DEP permit. No trades needed at this time. Building Construction Midpoint County: Wood District 3 Headquarters Complex Please be advised: West Virginia Division of Highways will not require subcontractor prequalification for this project. All contractors submitting bids on project(s) must submit electronically with their bid a Proposal Guaranty Bond for $500.00 or 5% of the total bid, whichever is greater. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. WVDOT - 004 - District 3 Headquarters Complex PN - G054-D3HQC 25 00

Award

Municipal

$41,558,090.00

Public - State/Provincial

New Construction, Site Work

5

45

8

11

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
103
Bidding Soon
1,278
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

July 6, 2026

Project location map

Multiple Locations, Kanawha, WV


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed