Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 31, 2025 at 8:00 PM
Updated August 16, 2025
Site work and renovation of a clubhouse / community center in Winnipeg, Manitoba. Completed plans call for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.
Reference Number 0000298993 Pricing Lump sum D2.1 The Work to be done under the Contract shall consist of the evaporative condenser replacement as specified in Part E E5, that includes removal, fabrication, installation of a new structural support stand at 27 Overton Street. D2.2 The major components of the Work are as follows: (a) Safe removal of the existing evaporative condenser, including all associated equipment and connections, and appropriate disposal of the equipment and of any remaining fluids. (b) Safe removal of the existing structural stand and concrete piles. (c) Procurement and installation of the new evaporative condenser, including engineered design for the support stand and new concrete work. (d) Collaboration with the successful bidder for refrigeration system start-up. (e) Provide storage for the new condenser in a secured facility until the scheduled commencement of the project in early June 2026, or sooner upon notification by the Contract Administrator. The Work must be completed in accordance with the Substantial Performance Date D19 and Total Performance Date D20 to ensure there is no disruption to arena operations. If the Contract Price exceeds twenty-five thousand dollars ($25,000.00), the Contractor shall provide and maintain contract security until the expiration of the warranty period in the form of: (a) a performance bond of a company registered to conduct the business of a surety in Manitoba, in the amount of fifty percent (50%) of the Contract Price; and (b) labour and material payment bond of a company registered to conduct the business of a surety in Manitoba, in an amount equal to fifty percent (50%) of the Contract Price. (c) an irrevocable standby letter of credit issued by a bank or other financial institution registered to conduct business in Manitoba and drawn on a branch located in Winnipeg, in the amount of fifty percent (50%) of the Contract Price; or (d) a certified cheque or draft payable to "The City of Winnipeg", drawn on a bank or other financial institution registered to conduct business in Manitoba, in the amount of fifty percent (50%) of the Contract Price. Documents can be obtained from https://www.merx.com/ Question Deadline 08/08/2025 Via Online, All enquiries shall be directed to the Contract Administrator, at least five (5) Business Days prior to the Submission Deadline.
Post-Bid
Clubhouse / Community Centers
$400,000.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2025
September 15, 2025
27 Overton St, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Aug 07 2025
Winnipeg, MB
Bid Date: Aug 27 2025
Winnipeg, MB
Bid Date: Aug 19 2025
Winnipeg, MB
Bid Date: Aug 12 2025
Winnipeg, MB
Bid Date: Aug 08 2025
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Aug 20 2025
Winnipeg, MB
Bid Date: Aug 20 2025
Winnipeg, MB
Bid Date: Aug 07 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Aug 06 2025
Winnipeg, MB
Bid Date: Aug 14 2025
Winnipeg, MB
Bid Date: Aug 27 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
