Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 1, 2025 at 8:00 PM
Updated August 5, 2025
Renovation of a detention facility in Elk Point, South Dakota. Completed plans call for the renovation of a detention facility.
For the replacement of the existing jail door controls, utility control, and audio communication systems. Bids shall include the following. 30 door controls, 2 vehicle overhead door controls, 1 motorized window control, 3 monitored only doors, 32 intercom stations, 9 lighting controls, 5 inmate tv controls, 1 intercom master station, 1 computer in jail control, 1 Audio head end, 2 plc door control relay panels, 1 interface cabinet/panel at work release building, 1 plc utility relay panel Union county reserves the right to refuse all bids or to accept the bid deemed most cost effective for union county.
Post-Bid
Jails / Prisons
$300,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
