Site work for a civil project in San Clemente, California. Working plans call for site work for a water / sewer project.

As of November 14, 2025, bid has been rejected. No definite date for the rebid. Performing site clearing including removal of trees; grading, removal and abandonment of existing piping and valves; constructing new potable water pump station including construction of 16-inch diameter inlet and outlet piping, pump station building, retaining walls, valves, flow meters, flow meter vault, two (2) 24-inch diameter 1/4 -inch thick 316 stainless steel pump barrels, two (2) 2500 gpm capacity vertical turbine pumps, two 100 HP motors, electrical and controls improvements including coordination with SDG&E for 400 amp 3 phase 4 wire 480 volt power service to the pump station, switchgear, motor control center, variable frequency drives, harmonic filter, SCADA panel, manual transfer switch, portable generator connection, instrumentation, testing, disinfection, startup and commissioning, and site improvements complete and in place per the contract documents. Contractor shall possess a valid California contractor's license for the following classification(s): Class A. All electrical work will be completed by a contractor or a sub-contractor having a valid California C-10 certification. Liquidated Damages : $1,000 per day Q&A Deadline September 10, 2025 2:00 PM (PDT) Online Q&A : Yes Discrepancies in, and/or omissions from the Plans, Specifications or other Contract Documents or questions as to their meaning shall be immediately brought to the attention of City by submission of a written request for an interpretation or correction to City. Such submission, if any, must be submitted Electronically Project Duration : 300 working days

Final Planning

Water / Sewer

$4,271,262.00

Public - City

Site Work

45

46

25

8

Subscribe For Documents

103 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
282
Bidding Soon
3,502
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

May 14, 2026

Project location map

303 Via Socorro, San Clemente, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.