Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2025 at 8:00 PM
Updated September 13, 2025
Site work and paving for a mixed-use development in Lakeland, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Counties: Polk Road Name: SR 35 (US 98) Limits: At Lyle Pkwy and From N of Sr 60 to N of Cr 540a Project(s): 45261715201 Federal Aid No: N/A Project(s): 45381015201(*) Federal Aid No: D125033B Project(s): 45381015202 Federal Aid No: D125033B Total Roadway Length: 3.890 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 3.890 Miles Contract Days: 400 Contract Execution Days: 5 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Please read the full advertisement Description: The work under this contract consists of milling and resurfacing, widening, base work, sidewalk, drainage, signing and pavement markings, signalization, and lighting on State Road 35 (US 98) from north of State Road 60 to north of County Road 540A in Polk County. Note: Article 3-6 (Standard Specifications) has been revised for this project to require the successful bidder to return properly executed contracts within 5 business days after the contract award date. For each calendar day that the successful bidder is late in delivering all required documents in properly executed form to the Contracts Office, the Department will deduct one day from the allowable Contract Time. Question Deadline 08/20/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Resurfacing - State Road 35 (US 98)
Award
Roads / Highways
$10,205,482.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
October 27, 2025
FL-35, Lakeland, FL
Related To This Project
Lakeland, FL
Bid Date: Aug 26 2025
Lakeland, FL
Bid Date: Nov 07 2025
Lakeland, FL
Bid Date: Sep 17 2025
Lakeland, FL
--
Lakeland, FL
--
Lakeland, FL
--
Lakeland, FL
--
Lakeland, FL
Bid Date: Sep 03 2025
Lakeland, FL
Bid Date: Oct 24 2025
Lakeland, FL
Bid Date: Jul 17 2025
Lakeland, FL
Bid Date: Jul 11 2025
Lakeland, FL
Bid Date: Jul 18 2025
Lakeland, FL
Bid Date: Jul 22 2025
Lakeland, FL
Bid Date: Aug 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
