BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work and paving for a mixed-use development in Lakeland, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Polk Road Name: SR 35 (US 98) Limits: At Lyle Pkwy and From N of Sr 60 to N of Cr 540a Project(s): 45261715201 Federal Aid No: N/A Project(s): 45381015201(*) Federal Aid No: D125033B Project(s): 45381015202 Federal Aid No: D125033B Total Roadway Length: 3.890 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 3.890 Miles Contract Days: 400 Contract Execution Days: 5 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Please read the full advertisement Description: The work under this contract consists of milling and resurfacing, widening, base work, sidewalk, drainage, signing and pavement markings, signalization, and lighting on State Road 35 (US 98) from north of State Road 60 to north of County Road 540A in Polk County. Note: Article 3-6 (Standard Specifications) has been revised for this project to require the successful bidder to return properly executed contracts within 5 business days after the contract award date. For each calendar day that the successful bidder is late in delivering all required documents in properly executed form to the Contracts Office, the Department will deduct one day from the allowable Contract Time. Question Deadline 08/20/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Resurfacing - State Road 35 (US 98)

Award

Roads / Highways

$10,205,482.00

Public - State/Provincial

Paving, Site Work

208

11

6

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
148
Bidding Soon
2,544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

October 27, 2025

Project location map

FL-35, Lakeland, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.