BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2025 at 8:00 PM

Updated July 27, 2025

This is a service / maintenance or supply contract in New Tecumseth, Ontario. Contact the soliciting agency for additional information.

Town is seeking to retain an external consultant/consulting team (Prime Consultant) to conduct a detailed Indoor Pool Feasibility Study. The successful proponent's overall responsibility is to conduct a study that includes, but is not limited to an assessment of need, location, concept, site analysis, capital cost, operational business plan, funding strategy and design component (up to a Class D Estimate) within the context of a comprehensive public engagement strategy. The objective of the study is to propose a clear site and concept plan for consideration. The Prime Consultant is expected to work with staff to report to Council on timelines for completion of the Indoor Pool Feasibility Study and further report back to Council with findings and recommendations in a final Indoor Pool Feasibility Study that includes a proposed project plan and timeline for detailed design and construction. Question Deadline Date: 08/06/2025 02:00:00 PM ET The method of Contractor Selection has not been Determined at this time.

Conceptual

Swimming Pools

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
165
Bidding Soon
4,470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

Project location map

To Be Determined, New Tecumseth, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.