BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2025 at 8:00 PM

Updated October 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Tinley Park, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and water / sewer project.

** As of August 25, 2025 project has been awarded to McGill Construction LLC with an awarded amount of $1,206,589.11.** Site Directions: Harlem Ave. to 173rd Place, south on 68th Court. This project will consist of the construction of a new HMA parking lot with concrete curb, storm sewer, sidewalks and pavement striping. The improvements will also include lighting, landscaping and the construction of a volume-control area with native plantings. Pre-Bid Meeting Info: There will not be a Prebid Meeting. SCOPE OF WORK This project is being presented in two (2) phases (Phase 1 & Phase 2) both phases consists of the removal of the existing trees, concrete and bituminous pavement, parking lot stone, fencing, storm sewer system structures and piping, outdoor light poles and fixtures, concrete walls, and associated site debris. This project also includes the construction of proposed bituminous pavement, concrete curbing, concrete sidewalk, installation of storm sewer structures and associated piping, fencing, outdoor lighting, and excavation with related erosion control items with site restoration including fine grading and sod installation all as shown on the plans. The quantities called for in this contract indicate the approximate amount of work to be expected. The actual amounts for the various items may vary depending upon actual field conditions. The Village reserves the right to reduce or increase the scope of project quantities and to delete entire line items. It shall be understood and agreed upon that the unit prices for these items shall prevail throughout the period of the contract and that no additional compensation per unit price or otherwise will be allowed for any increase or decrease in the quantities including, but not limited to, decreases due to the deletion of an entire location/section of the improvement. No increase in unit price will be allowed if method of construction changes due to decreased quantity

Award

Sidewalks / Parking Lot

$1,206,589.00

Public - City

Outdoor Lighting, Paving, Site Work

25

14

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
456
Active Projects
260
Bidding Soon
3,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

September 10, 2025

Project location map

Multiple Locations, Tinley Park, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.