Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work and paving for a civil project in Conroe, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Water, Sewer and Drainage improvements for Walden Creek Section 1 development. Question Deadline 08/18/2025 at 10:00 AM CT Online question deadline . Bidder shall immediately notify ENGINEER in writing upon finding errors, discrepancies, or omissions in Bid Documents. Verbal discussions and answers are not binding. Notification must be received no later than forty-eight (48) hours prior to the Bid Opening. Replies will be by written Addenda. CONTRACTOR shall verify all existing site conditions, and confirm points of connections to existing improvements, including confirmation of elevations and grades of existing facilities and utilities prior to starting any grading, paving or utility installation. Verification of locations and functions of each existing structure or system and all existing utility grades and invert elevations is the contractor's responsibility. Notify the engineer of any discrepancies immediately. Any conflicts or errors between existing field conditions and engineering plans must be resolved prior to starting excavation or setting any gravity sewer (storm or sanitary) and appurtenances. The engineering drawings may include information from Appraisal District Parcels, LiDAR, and/or Aerial Imagery. CONTRACTOR shall field-verify property corners, right-of-way and easements prior to starting construction. CONTRACTOR is responsible for verifying the proposed improvements are located inside the property, right-of-way or easements as designated on the plans. CONTRACTOR shall notify engineer of any discrepancies before starting construction. When the area is to be surfaced or paved, after the earthwork has been substantially completed and after all storm sewer and drains have been laid, the subgrade shall be brought to the lines, grades and typical cross section shown on the Drawings and in accordance with these Specifications. Scope 1. This item includes curb, gutter, combined curb and gutter, sidewalks and/or driveways, with or without reinforcing steel composed of Portland cement concrete constructed on approved subgrade, foundation material or finished surface in accordance with the lines and grades established by the ENGINEER and in conformance with the details shown on the plans. 2. As used in this item, the work "curb" refers to concrete curb, concrete gutter and combined concrete curb and gutter.

Bid Results

Water / Sewer

$3,822,971.00

Public - County

Paving, Site Work

40

20

13

6

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
83
Bidding Soon
3,710
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

September 30, 2025

Project location map

Multiple Locations, Conroe, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.